Project Info
- Location: Boston, MA
- Category: Foundation Systems
- MA Convention Center, Boston MA :
Project Details
NSI was hired to remove 45’ steel sheets from a former contaminated soil site. In place for over year, the sheets permitted the removal of a deep contaminated layer. After a year in place, the sheets acquired a thick layer of Boston clay that had to be scraped by hand by the NSI field staff.